PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installed one course of block at the 1st floor Attorneys Room Facing East.jpg 3rd floor sprinkler branches-heads Facing West.jpg 3rd floor Sprinkler raiser Facing North-West.jpg Continued laying out block along the South Elevation rooms Facing East.jpg Erecting Stone panels at the 4th floor East Elevation 1.jpg Erecting Stone panels at the 4th floor East Elevation 2.jpg Installed piping at the 4th floor Facing West.jpg Installing duct work at the 4th floor Facing North.jpg Installing pipe hangers at the 2nd floor Facing West.jpg
Previous pageNext page Erecting Stone panels at the 4th floor East Elevation 1
Erecting Stone panels at the 4th floor East Elevation 1